Permit Signal

Enforcement briefs · TX · LA · NC

Know which plant got cited before the RFP goes out.

Every day, Permit Signal reads the public EPA and state enforcement records for your counties and, when something new appears, sends a one-page brief: which wastewater or stormwater facility was cited, what was violated, what it will likely need, and the permit record to reach the owner.

Free sample, no account needed. Tell us your county and what your firm does; the current brief usually comes back the same day.

Permit Signal · BriefNew signal
Facility
Northlake WWTPNorthlake, Denton County, TX
Action
State CWA Penalty Agreed Order · TCEQ · Aug 18, 2026
Penalty
$132,167
Pattern
34 effluent limit exceedances in the prior 18 months treatment upgrade
Likely need
Corrective action plan and a plant capacity evaluation. Orders of this size are typically followed by an engineering contract within 60–90 days.
Record
Permit number, permit holder and agency contact as listed in the public record, with a link to the ECHO facility report
SOURCE: EPA ECHO · ICIS-NPDES · TCEQURGENCY 5 / 5

Real example from the public record, August 2026. Names, dates and amounts as published by EPA/TCEQ. See today's full brief →

58,000+
enforcement events tracked in TX, LA and NC since 2019
12,000+
permitted facilities followed
Daily
records read every day; agencies publish weekly
2 sources
EPA ECHO national data plus TCEQ notices of violation that never reach ECHO

How it works

Public records, read every day so you don't have to.

The information is already public. The problem is that nobody has time to read enforcement dockets every day. We do, and we send you only what matters in your counties.

STEP 1 · READ

We read the record

Formal and informal enforcement actions, penalty orders and quarterly non-compliance data from EPA ECHO for TX, LA and NC – plus, for Texas, every Notice of Violation TCEQ publishes in its own open data, including public water systems that ECHO never covers.

STEP 2 · SORT

We sort out what matters

Each new action is classified by what the facility will likely need – treatment upgrade, collection system, monitoring and reporting, permit work or stormwater – and rated for urgency using penalties, non-compliance status and 18 months of history.

STEP 3 · SEND

You get a one-page brief

Facility, action, penalty, the pattern behind it, the permit record and a plain-English line on what to offer. Only your counties. Nothing on quiet days.

Who it's for

Small firms that win work by showing up first.

Most signals come from small plants: municipal WWTPs of towns under 20,000 people, utility districts, subdivision package plants, and industrial sites with stormwater permits. That is exactly where local firms compete.

Contract operators

District and package-plant boards revisit who runs their plant right after a penalty order – for a few weeks. In Texas the brief also covers public water systems cited by TCEQ.

Engineering firms

Orders and reviews are followed by capacity studies, corrective action plans and design contracts.

Compliance and DMR consultants

Missed DMRs, notices of violation and enforcement responses – each with a deadline attached.

Stormwater and SWPPP

Industrial and construction sites cited under their stormwater permits need updated plans and BMP fixes fast.

The honest comparison

EPA already has a free notification tool. Here is what it does and doesn't do.

ECHO Notify is a good service and we say so. It sends a weekly list of raw changes in the EPA database. Permit Signal is the layer on top: read daily, filtered to your trade and counties, with the state record ECHO doesn't have and a plain-English line on what the facility will need.

EPA ECHO Notify (free)Permit Signal
CadenceOne email a week, all changes since the last oneRead every day, sent within a day of a record appearing
What you receiveRaw database rows and codes; all programs (air, water, waste) unless you filter them yourselfOne page per signal: facility, action, penalty, 18-month pattern, likely need
Texas state noticesOnly what TCEQ reports into EPA's system, often weeks to months laterTCEQ's own Notice of Violation data, including public water systems ECHO never lists
Filtered to your tradeBy place and program onlySorted into treatment, collection, monitoring, permit, stormwater and water-system work, rated by urgency
ExclusivityAnyone can subscribe to the same countyOne subscriber per county and trade
Set-upCreate an ECHO account, build subscriptions per state and programTell us your county and trade; nothing to install or learn
QuestionsHelp deskŠtefan replies, usually the same day

If a weekly raw feed is all you need, ECHO Notify is free and we recommend it. Permit Signal is for firms that want the reading done for them and their county to themselves.

Pricing

One subscriber per county and trade. That's the point.

A lead list is only worth something if your competitors don't have it. Each county is sold to one firm per trade.

County exclusive

For local operators, engineers and consultants

$199 / month
  • A brief whenever your county has a new record
  • Nobody else in your trade receives it for that county
  • Additional counties available
  • First two weeks free, cancel any time
Request the free trial

State, one trade

For regional firms covering a whole state

$499 / month
  • Every county in TX, LA or NC
  • Exclusive within your trade for that state
  • Briefs sorted by urgency, sent when something is new
  • First two weeks free, cancel any time
Request a state trial

No card to start; each trial is confirmed personally by e-mail. Before it ends you get one e-mail about continuing – month to month, no contract. If a paid month wasn't useful, say so within 14 days and it is refunded – see the refund policy.

Sources and fair use

Only the public record. Nothing scraped from private systems.

Permit Signal is built on the EPA's Enforcement and Compliance History Online (ECHO) datasets for the NPDES program – the same records anyone can download – and, for Texas, on the Notices of Violation TCEQ publishes on the Texas Open Data Portal. We read both every day, structure them and add a plain-English reading of what the facility will likely need.

A brief is a pointer to a public record, not a judgment of the facility. Every brief links to the underlying ECHO facility report or TCEQ Central Registry entry so you can check the record yourself. Permit Signal is not legal advice and is not affiliated with any agency.

  • EPA ECHO · ICIS-NPDES national datasetFacilities, permits, enforcement actions, quarterly non-compliance reports
  • TCEQ Notices of Violation · Texas Open Data PortalEvery NOV letter TCEQ regions issue, with the rules cited – wastewater, stormwater and public water systems. Most never appear in ECHO
  • State actions in ECHOTCEQ, LDEQ and NCDEQ enforcement actions as reported to EPA
  • Permit recordsPermit number, permit holder and agency contact as listed on the public record
  • Freshness, honestlyEPA refreshes ECHO weekly and TCEQ posts NOV data about monthly; agencies can take weeks to enter an action. We read every day and send an item within a day of it being published – we cannot make an agency publish faster

Questions

Straight answers.

Is it legal to use this for business development?

Yes. Enforcement actions, permits and non-compliance reports are public records published by EPA and the state agencies precisely so that the public can see them. Permit Signal reads and organizes them; it does not access anything private.

How is this different from checking ECHO myself, or from ECHO Notify?

You can – it's all there, and ECHO Notify will email you weekly changes for free. But ECHO is built for regulators and researchers, not for a contractor with ten minutes in the morning, and it doesn't carry TCEQ's own notices. We check every county you cover daily, add the Texas state record, filter out the noise, add 18 months of context and tell you what the facility will likely need, in one page. See the comparison above.

What does "exclusive" mean?

For each county we take one subscriber per trade – one contract operator, one engineering firm, one compliance consultant, one stormwater firm. Your direct competitors in that county don't get the brief.

How current is the data?

EPA refreshes the national dataset about once a week and TCEQ publishes its NOV data about monthly; agencies themselves can take days to weeks to enter an action. We read every source every day, so you see an action within a day of it being published – typically well before it turns into an RFP. We won't claim real-time; nobody has that.

Do you send facility contact details?

We include what the public permit record lists – permit number, permit holder and the agency contact – plus a link to the ECHO facility report. We don't buy or scrape personal contact data.

How do I start and how do I cancel?

Send the form with your county and what your firm does. You get the current week's signals for free, then a two-week trial at no charge with a brief every day there is something new. If it's useful, billing is monthly; cancel with one email.

Who's behind it

Built and run by one person.

Štefan Toporcer – product designer with a background in B2B sales. Permit Signal started as a question: why do contractors find out about a plant's enforcement trouble only when the RFP is already out? The data was public all along; it just needed someone to read it every day. Replies come from Štefan, not a ticket system.

Free sample

Tell us your county. The brief is on its way the same day.

Thirty seconds, no account needed. Tell Štefan your county and what your firm does; you'll get the current brief back the same day and can decide from there.

Request a free sample

or write directly: steve@getpermitsignal.com

Get this week's brief for your county – free

You get the current brief for your county – new signals, early warnings and permit renewals – usually the same day. No account needed, nothing to install.

Prefer email? Write to steve@getpermitsignal.com with your county and what you do.